Construction period: 2021-2022. Description of works performed: “Execution of preparatory works on the tunnels for the installation of equipment for establishing intelligent transportation systems. Preparatory works include repairing water ingress in the walls, repairing concrete damage, and final painting of the ceiling. Dragoraj Tunnel: length 260 m, on the main road M5 Bihać-Jajce; Ugar Tunnel: length 270 m, on the…
Successfully completed works on the construction of the AB bridge in Gornja Šnjegotina, Teslić municipality.
Instead of the existing reinforced concrete bridge, which is significantly damaged and ruined by large waters and floods, a new reinforced concrete bridge is being built that will (in accordance with the project of regulation of the coast and riverbeds of the Vrbanja river), also provide the corresponding flow profile. The bridge is located in the center of Celinac, at…