Residential-commercial building Casa Mia, Banja Luka

Construction period: 2019-2022.

GFA (m²): 16,050

Description of works performed: “Design and construction of a residential-commercial complex consisting of 2 blocks, with floors: 2 basements, ground floor, 6 stories, and attic. Works performed: preparatory, earthworks, reinforced concrete works, masonry, drywall, painting, waterproofing, ceramic works, flooring, metalwork, carpentry, and facade works.”

Contracting authority: “Aragosta Invest”, Banja Luka

Podjelite sa drugima!